Hotel

The Hotel Project is a $12M hospitality development designed to deliver a modern, full-service hotel experience in a high-demand market.

Site Preparation (Apr–Jun 2026)
Clearing, grading, and readying the land for development.

Foundation Work (Apr–Jun 2026)
Laying structural foundations to support vertical construction.

Vertical Construction (Jul 2026–Apr 2027)
Rising structure with core hotel framework completed.

Interior Build-Out (Jul 2026–Apr 2027)
Finishing interiors, utilities, and guest-ready spaces.

FF&E Installation (May–Jun 2027)
Furniture, fixtures, and equipment setup before opening.

 
Total Area: 64,800 Sq. Ft 
No of Floors:4 
No of Rooms: 107 
Project Cost: $ 12M
res

Metro Diner

The Metro Diner Project is a $3M premium dining development designed to bring a modern restaurant experience to the community. With a unit area of 3,000 sq. ft., the proposed floor plan features spacious dining areas, a well-equipped kitchen, and dedicated service spaces to ensure operational efficiency.

Positioned as a destination for casual and family dining, Metro Diner will combine comfort, convenience, and culinary excellence. The project promises sustainable long-term returns while meeting the growing demand for quality dining spaces in the region.

Total Area: 3000 Sq. Ft
Project Cost:$3M

strip

Strip Mall

The Strip Mall Project is a $10M retail development designed to deliver a modern shopping experience and serve as a commercial hub for the community. The proposed floor plan features three blocks with a total of 39 retail stores—11 stores in Block 1, 14 stores in Block 2, and 14 stores in Block 3—each offering 1,200 sq. ft. of space to attract diverse tenants.

Total Area :48,124Sq. Ft
Blocks:03
No of Stores:39 Stores
Parking:242
Required Parking:240
Project Cost: $10M

aprt

Apartment

The Apartment Project is a $20M residential development designed to deliver modern living spaces with comfort, connectivity, and convenience. With multiple apartment blocks built in carefully planned phases, the project emphasizes sustainability, quality infrastructure, and community-friendly design. Spanning over 21 months of phased construction and supported by robust site development and amenities, the Apartment Project is set to become a premium residential hub. The project will be ready for tenant move-in by July 2027, offering long-term value and lifestyle benefits for residents.

Unit Area:1336 Sq. Ft
No of Blocks:02
No of Apartments:17
Total Units:204
project Cost:$20M

as

Assisted Living

Magnolia’s Assisted Living Project is a $15M senior care development designed to provide high-quality eldercare in a growing region. With investor approvals secured, the project moves through a clear timeline—from design and infrastructure in 2026 to facility and duplex construction—leading to its grand opening in July 2027. This modern, community-focused facility combines care, comfort, and stability while driving local economic growth.

Unit Area:12 Acres
City has requirement for:180 People
project Cost:$15M

single

Golf Course & Single Family

The Golf Course & Single Family Project is a $30M master-planned development that combines premium residential living with world-class golf amenities. Beginning in January 2026 with land survey, golf course layout, and master planning, the project advances through infrastructure and earthwork (Apr–Jun 2026), followed by home construction in phases (Jul 2026–Mar 2027). Landscaping and golf course finishing are scheduled for Apr–May 2027, with sales, move-ins, and course operations launching from June 2027 onwards. Designed to deliver both lifestyle and investment value, this project creates a vibrant community anchored by quality housing and a destination golf experience.

Total Area: 18.47 Acres
Project Cost: $30M